01 / PROJECT RESOURCE
Equipment & capacity sheet
A clean summary of the documented equipment configuration, rated capacities and project-planning qualifications.
Download PDFRESOURCES
Practical project intake guidance and documented equipment information to support a useful first conversation.
01 / PROJECT RESOURCE
A clean summary of the documented equipment configuration, rated capacities and project-planning qualifications.
Download PDF02 / PROJECT RESOURCE
What to prepare for technical review: material, format, batch size, project stage and dependencies.
Download PDFPROJECT PLANNING FAQ
The 5.5 m²-class system documents a 54 L tray load at 10 mm depth and loading for at least 21,000 Ø16 mm 2 mL vials or 10,800 Ø22 mm 10 mL vials. These are alternative loading configurations, not simultaneous loads or daily output guarantees.
We assess lyophilization cycle needs, batch loading and upstream/downstream equipment together. Substantial drying capacity and coordinated filling, drying and capping help address bottleneck risk during project planning. Actual scheduling and throughput are agreed after technical review.
Your material description, intended format, approximate batch size, project stage and target timeline. Please do not submit confidential technical documents through the public inquiry form.
No. Each material and application is subject to technical review for compatibility with the available configuration and the agreed project scope.
Email info@pmgsciences.com to arrange document sharing for your project. Please do not include confidential technical documents in the public inquiry form.
No. Supplier machine speeds are configuration ratings. Material behavior, drying cycle, packaging geometry, changeovers, review steps and scheduling affect project-specific output and timing.
LET’S DEFINE WHAT’S NEXT
Bring us your material, requirements and goals.
We’ll start with the right questions.